© 2019 Stonehouse Property Care.

  • LinkedIn Social Icon
  • Facebook Social Icon
  • Twitter Social Icon

MAYFAIR OFFICE

1/5

Diagnosis

This project involved us assessing an unused large vault below a busy office. It was ideally positioned as a meeting room but was wet and unaltered since first used for the storage of coal delivered through the coal hole in the pavement outside.

 

Solution

We lined the vault with a meshed cavity drain membrane system, draining into a sump and pump set into the concrete floor slab. We carefully lined shafts to glass block windows which replaced the original air vents and provide some natural light.

Enquiries

To book a survey or if you have a question which needs our help please complete the following form or call 01491 577 560.