Diagnosis

Malmaison Hotel is positioned within the historic site of a Grade I listed jail in central Oxford. Its large, new-build, fully waterproofed underground kitchen is located below the paved area. Stonehouse were consulted at an early stage in the project, ensuring that the complicated design was practicable when we started work some 3 years later.

 

Solution

Stonehouse specified Foamglas Perinsul blocks at the base of the block walls. These blocks are the same height as the basedrain preventing a cold bridge at this point. Blockwork was then built off this insulation.